Sunday, March 23, 2008

Electrics

To put it mildly, I have been miffed. The electrical control box melted the other week and I have rewired, and slightly redesigned the way the Monarch works.

The builder came down to help a little, which is what he did and we seem now to be back online. Was very hard work as we were working at odds to each other, I wanted to improve the circuits whilst he wanted them as they were....all ended amicably over a pint in the Anchor!

We've moved the control box out of the engine room which I think is a great improvement-it did used to look a little like an old fashioned coin operated electric meter, one might wonder if the paddles would stop turning if the 50p ran out!

Wednesday, March 12, 2008

The Launch

Well the press launch went very well, we had a couple of guys down from the radio, one from ITV and the team from Cowes Online. I've spoken to the Editor of http://www.cowes.co.uk/ quite a few times, but have never met him-so it was nice to finally put a face to a name (was hard to see his face I must admit; he's about 8 miles tall and I just about come up to his knees!). The Austin 7's car club came out in force, and a small locomotive was on display courtesy of IW model engineers. All lovely, except for the bloody wind which killed the marquee and any chance of sailings....indeed the awful weather prevented the boat from being fully finished in time either! Hopefully we'll get out in her soon!

Tuesday, March 11, 2008

boiler test 2

After much silver soldering on Ian's part and lots of tightening, repacking and servicing (all of which we were told had been bloody done) the boiler finally passed. Not with flying colours I must add, as there were still some minor fizzles from a couple of new joints but we'll let them cool down and tighten them a little tomorrow.

At least we've got a certified boiler before launch day!!

Weather is looking appalling for the event itself though!